Skip to content
BATTERY STORAGE SITING REPORT · GREAT BRITAIN

Know if a battery site is worth pursuing before you spend on it.

One report on one site in Great Britain, covering grid, planning, land and returns, so your team can say yes or no with the evidence in hand.

£1,950 a site, excluding VAT Add a paired solar site for £500 more.

Order a report by email today and receive it in three working days. Ordering online and through an API is in early access.

Ripples spread across a dotted pond from a lily pad that marks the site. Four petals grow from the pad for grid, planning, land and returns, each drawn inside a faint outline of a full score, and the shortest petal, planning, is tipped with an amber dot. A dragonfly drifts over the water. The scores are samples.
Illustrative. Not your data.
WHY TEAMS CHOOSE IT

Why developers choose it

A faster yes or no

Reach a view on a site in days, before you commit to surveys and legal work.

See what could end it

The report names the grid, planning or land issue most likely to stop the site.

Figures you can defend

Every number shows its source and date, so the report holds up when your team reviews it.

WHAT YOU GET

What is in the report

A clear verdict

Pursue or pass, with the reasons.

Grid position

Nearby connection points, published headroom and the projects already holding capacity.

Planning and land constraints

Designations, flood zones, heritage, green belt, peat and farmland grade on one map.

Competing storage nearby

Operating, consented and pending battery schemes around the site.

Returns

Low, central and high cases, and what moves the answer.

Sources

Where each figure came from and when it was published.

WHO IT IS FOR

Who is it for?

Battery developers

Decide which sites deserve surveys and legal work.

Land teams and agents

Start the conversation with a landowner with evidence behind you.

Landowners

Understand whether a site suits a battery and whether an offer is fair for the location.

HOW IT WORKS

How it works

01

Send the site

A location or boundary, and the size of battery you have in mind.

02

We prepare the report

We check grid, planning and land, and model the returns.

03

You decide

You receive the report and take it to your team or your landowner.

GOOD TO KNOW

Good to know

  • The report covers Great Britain. Northern Ireland is not covered.
  • Grid figures are what the network operators have published, with their dates. They are not connection offers.
  • Returns are modelled from public figures and stated assumptions. They are not a revenue forecast.
  • The report does not replace the site studies a planning application needs.
FREQUENTLY ASKED

Questions about Battery storage siting report

Where does the grid information come from, and how current is it?

From the registers that NESO and the network operators publish. Every figure carries its source and the date that source published it.

Does it cover Scotland and Wales?

Yes, for grid, designations, heritage, flood, farmland and peat. Land title information covers England and Wales only.

Can I change the assumptions?

Yes. Battery size, duration, cost and the treatment of grid reinforcement can be changed, and the report shows what moved as a result.

Does the report predict a connection offer or a planning decision?

No. It shows what has been published and labels cost and delay as assumptions. The network operator and the planning authority decide.

How much does it cost?

£1,950 a site, excluding VAT. Adding a paired solar site is £500 more.

How long does it take, and how do I order?

Three working days from a complete order. Order by email today. Ordering through an API is in early access.

Related: Grid pre-screen · Planning risk screen

Want a report on a battery site?

Send us the location and the battery size. We will confirm what the report covers and when you will have it.

Request a report →

Prefer email? Write to hello@arithim.com.

Call us